2008 OASDI Trustees Report

Table of Contents Previous Next Tables Figures Index


 
E. STOCHASTIC PROJECTIONS
Significant uncertainty surrounds the estimates under the intermediate assumptions, especially for a period as long as 75 years. This appendix pre­sents a way to illustrate the uncertainty of these estimates. It is intended to supplement the traditional methods of examining such uncertainty and to illustrate the potential value of new techniques.
1. Background
The Trustees Report has traditionally shown additional estimates using the low cost and high cost sets of specified assumptions to reflect the presence of uncertainty. These additional estimates provide a range of possible outcomes for the projections. However, they provide no indication of the probability that actual future experience will be inside or outside the range of these esti­mates. This appendix presents the results of a model, based on stochastic modeling techniques, that estimates a probability distribution of future out­comes of the financial status of the combined OASI and DI Trust Funds.
It should be noted that this model is subject to further development. Future improvements and refinements are expected to be more likely to expand rather than reduce the indicated range of uncertainty.
2. Methodology
Other sections of this report provide estimates of the financial status of the combined OASI and DI Trust Funds using a “deterministic” model. For the deterministic model, certain assumptions are made regarding levels of fertil­ity, changes in mortality, legal and other immigration levels, legal and other emigration levels, the Consumer Price Index, average real wages, unemploy­ment rates, trust fund real yield rates, and disability incidence and recovery rates. Each of these variables will reach an assumed ultimate value at a spe­cific point during the long-range period and will maintain that value through­out the remainder of the period. As mentioned above, three deterministic scenarios are developed assuming separate, specified values for each of these variables.
In contrast, the results of 5,000 independent stochastic simulations are pre­sented in this appendix. Each of the 5,000 simulations is determined by allowing the above variables to vary throughout the long-range period. The fluctuation in each variable is projected by using standard time-series model­ing, a method designed to help make inferences based on historical data. Generally, each variable is modeled by an equation that captures a relation­ship between current and prior years’ values of the variable and introduces year-by-year random variation, as reflected in the historical period. For some variables, the equations additionally reflect relationships with other vari­ables. Parameters for the equations are estimated using historical data for periods between 20 years and 110 years depending on the nature and quality of data available. Each time-series equation is designed such that, in the absence of random variation, the value of the variable would equal the value assumed under the intermediate set of assumptions. More detail on this model, and stochastic modeling in general, is available on the Social Security website.1
For each simulation of the model, values for most of the variables listed above are determined by using Monte Carlo techniques to randomly assign the year-by-year variations. The one exception is that net other immigration is modeled rather than individually modeling other immigration and other emigration. Each simulation produces an estimate of the financial status of the combined OASI and DI Trust Funds. Results shown in this section, based on 5,000 simulations of the model, reflect the distribution of results.
The results from this model should be interpreted with caution and with a full understanding of the inherent limitations. Results are very sensitive to equa­tion specifications, degrees of interdependence among variables, and the his­torical periods used for the estimates. For some variables, using the variations exhibited in a relatively recent historical period may not provide a realistic representation of the potential variation for the future. In addition, results would differ if random variations had been applied to additional vari­ables other than those mentioned above (such as labor force participation rates, retirement rates, marriage rates, and divorce rates). Furthermore, addi­tional variability could result from incorporating statistical approaches that would more fully model change in the long-range central tendencies of the variables. The historical period available for most variables is relatively homogeneous and does not reflect many substantial shifts. The time-series modeling reflects what occurred in the historical period. As a result, the vari­ation indicated in this appendix should be viewed as the minimum plausible variation for the future. Substantial shifts, as predicted by many experts and as seen in prior centuries, are not fully reflected in the current model.
3. Results
Simulated probability distributions of the annual trust fund ratios for the combined OASI and DI Trust Funds are shown in figure VI.E1. The two extreme lines in this figure illustrate the range within which future annual trust fund ratios are estimated to occur 95 percent of the time (i.e., a 95-per­cent confidence interval). In other words, actual future trust fund ratios in a given year would be expected to exceed the upper bound only 2.5 percent of the time or to fall below the lower bound 2.5 percent of the time. Other lines in the figure display additional confidence intervals (80-percent, 60-percent, 40-percent, and 20-percent) around future annual trust fund ratios. The median estimate for each year indicates the trust fund ratio which is pro­jected by this model to fall exactly in the middle of possible outcomes for that year. It is important to note that these lines do not represent the results of individual stochastic simulations. Instead, for each given year, they represent the percentile distribution of trust fund ratios based on all stochastic simula­tions for that year.
The median estimate for each year indicates that the assets of the combined OASI and DI Trust Funds would be exhausted by the end of 2041 with a probability of 50 percent. This exhaustion date is the same as the year of exhaustion projected under the intermediate assumptions. Figure VI.E1 shows that the 95‑percent confidence interval for the trust fund ratio in 2030 ranges from 379 to 87 percent of annual cost. In comparison, the 2030 trust fund ratios for the low cost and high cost alternatives are each outside this range, at 429 and 28 percent, respectively. By 2082, the range represented by the low cost and high cost projections increases substantially beyond the boundaries of the 95-percent stochastic confidence interval, as seen from the values for the open group unfunded obligation in table VI.E1. This increased variation of the alternatives relative to the stochastic confidence interval is also seen in the positive trust fund ratio for the low cost scenario for 2082.
 
Figure VI.E1.—Annual Trust Fund Ratios
The probability distribution of the year-by-year OASDI cost rates (i.e., cost as a percentage of taxable payroll) is shown in figure VI.E2. The range of the cost rates widens as the projections move further into the future, reflecting increasing uncertainty. The income rate under the intermediate assumptions is also included in the figure in order to give some indication of the patterns of cash flow for the OASDI program. Only this income rate is included because of the relatively small variation in income rates throughout the pro­jection period. The lines in figure VI.E2 display the median set (50th percen­tile) of estimated annual cost rates and the 95-percent, 80-percent, 60‑percent, 40-percent, and 20-percent confidence intervals expected for future annual cost rates. It is important to note that these lines do not repre­sent the results of individual stochastic simulations. Instead, for each given year, they represent the percentile distribution of cost rates based on all sto­chastic simulations for that year. The projected cost rates for the year 2035 for the low cost and high cost alternatives described earlier are 14.65 percent of payroll and 19.34 percent of payroll, respectively. These are close to the limits of the 95-percent confidence interval (14.58 and 19.46 percent of pay­roll), as can be seen in figure VI.E2. By 2082, the cost rates for these alterna­tives, 12.62 and 24.81 percent of payroll, are still close to the limits of the 95-percent confidence interval (13.13 and 24.84 percent of payroll).
 
Figure VI.E2.—Annual Cost Rates
Table VI.E1 displays long-range actuarial estimates that illustrate uncertainty for the combined OASDI program using both the deterministic and stochas­tic approaches. Actuarial estimates included in the table are for the long-range period, 2008-82. Stochastic estimates are shown for the median (50th percentile) and for the 95-percent and 80-percent confidence intervals. For comparison, deterministic estimates are shown for the intermediate, low cost, and high cost assumptions. Each individual stochastic estimate displayed in the table represents the level at that percentile from the distribution of the 5,000 simulations. However, for each given percentile, the stochastic esti­mates shown for the different long-range actuarial measures are generally not from the same stochastic simulation.
Median stochastic estimates for the actuarial measures displayed in table VI.E1 are the same or slightly more pessimistic for the combined OASI and DI Trust Funds than those projected under the intermediate assumptions. The median estimate of the long-range actuarial balance is -1.79 percent of tax­able payroll, about 0.09 percentage point lower than projected under the intermediate assumptions. The median estimate for the first year cost exceeds tax income is 2016. This is 1 year earlier than projected under the intermediate assumptions. The median estimate for the year assets first become exhausted is 2041. This is the same as the year projected under the intermediate assumptions. The median estimate for the annual cost in the 75th year of the projection period is 17.85 as a percentage of taxable payroll and 5.92 as a percentage of GDP. The comparable estimates using the inter­mediate assumptions are 17.50 and 5.82, respectively.
The 95-percent confidence interval determined by the stochastic modeling projections can be compared to the range of variation defined by the tradi­tional low cost and high cost alternatives. For three of the measures in table VI.E1 (the actuarial balance, the open group unfunded obligation, and the first year assets become exhausted), the 95-percent stochastic projection range is narrower than the range defined by the low cost and high cost alter­natives. That is, for these measures, the estimates under the low cost and high cost alternatives fall outside the 95-percent confidence interval deter­mined by the stochastic modeling projections. In contrast, for two other mea­sures in the table (the first year cost exceeds tax income and the annual cost in the 75th year of the projection period expressed as a percentage of GDP), the 95-percent stochastic projection range includes the estimates under the low cost and high cost alternatives. For the remaining measure in the table (the annual cost in the 75th year of the projection period expressed as a per­centage of taxable payroll), the 95-percent stochastic projection range includes the estimate under the high cost alternative, but does not include the low cost estimate.
 
Table VI.E1.—Long-Range Estimates Relating to the Actuarial Status of the Combined OASDI Program[Comparison of deterministic and stochastic results]
Traditional
deterministic model
Interme­diate
Low
Cost
High
Cost
Median
50th
percentile
80-percent
confidence interval
95-percent
confidence interval
10th
percentile
90th
percentile
2.5th
percentile
97.5th
percentile
Open group unfunded obligation (in trillions)
Annual cost in 75th year (percent of taxable pay­roll)
Annual cost in 75th year (percent of GDP)

1
For some stochastic simulations, the first year in which trust fund assets become exhausted does not indi­cate a permanent exhaustion of assets.

2
The fund is not estimated to be exhausted within the projection period.

 

1
www.socialsecurity.gov/OACT/stochastic/index.html


Table of Contents Previous Next Tables Figures Index
SSA Home | Privacy Policy | Website Policies & Other Important Information | Site Map | Actuarial Publications March 25, 2008